Skip to main content
Demo session – your progress won't be saved.Create Free Account
HAIEC
ConsoleD
Skip to monitoring content

Deployment Governance — demonstration

Deploy AI with confidence. Govern every consequential action.

Enterprise control room — fictional manufacturing

Demo playback

Within approved scope — Vision Inspection AI · SYS-340

Action & scope
Within approved scope — Vision Inspection AI — AI action proposed: Score inspection images and route suspect cylinder heads to quality review
Reviewer
Waiting…
Monitoring & evidence
Waiting…
3
Approved (scoped)
2
Rejected
4
Pending review
9
Fictional systems

Vision Inspection AI

SYS-340 · Fictional production

Approved — scoped
HAIEC Assurance Result
Review required
Human Review Decision
Approved — scoped
Monitoring Coverage
Established — simulated
Approver role (fictional)
Inspection Quality Manager

Read-and-route operation is reversible and bounded; every disposition lands on a human reviewer. Autonomous release stays prohibited until qualified release-authority evidence exists.

✓ Read image batches✓ Score surface-defect indicators✓ Route suspect parts to human quality review✗ Autonomous part release✗ Direct MES disposition write✗ Model self-update without revalidation

Next: Operate inside the approved scope; any scope change returns to review.

Demand Forecast AI

SYS-FC1 · Fictional production

Approved — scoped
HAIEC Assurance Result
Review required
Human Review Decision
Approved — scoped
Monitoring Coverage
Established — simulated
Approver role (fictional)
Supply Chain Planning Director

Forecast generation is advisory; plan commitment authority remains with the accountable planner. A proposal is not a released schedule.

✓ Create demand forecasts✓ Propose production-plan revisions for planner review✗ Commit changes to a frozen master schedule✗ Release a production schedule✗ Alter firm orders

Next: Operate inside the approved scope; any scope change returns to review.

Predictive Maintenance Pilot

SYS-MNT88 · Controlled pilot (fictional)

Approved — pilot scope
HAIEC Assurance Result
Review required
Human Review Decision
Approved — pilot scope
Monitoring Coverage
Partial — simulated
Approver role (fictional)
Maintenance Engineering Manager

Pilot scope limits the agent to advisory condition estimates on two monitored machines. A recommendation-to-stop requires its own work-authorization evidence.

✓ Read condition-monitoring data✓ Estimate remaining-useful-life indicators✓ Recommend maintenance windows to Maintenance Engineering✗ Stop or start equipment✗ Dispatch maintenance work orders without authority✗ Alter CMMS records

Next: Continue the pilot inside its approved boundary; expansion requires a new review.

Supplier Quality AI

SYS-SUP12 · Fictional production

Rejected
HAIEC Assurance Result
Review required
Human Review Decision
Rejected
Monitoring Coverage
Stale — simulated
Approver role (fictional)
Supplier Quality Engineering Manager

Vendor qualification was expired in the scenario evidence; releasing it on an agent recommendation would bypass Supplier Quality authority. Rejection is scoped to the approval/change action — read-only review remains permitted.

✓ Read-only review of supplier qualification records✓ Flag expired PPAP status for human review✗ Approve or change a supplier on the approved master✗ Change a receiving-lot disposition✗ Override expired supplier qualification

Next: Requested expansion stays closed; advisory work continues under the existing scope.

Production Scheduler AI

SYS-SCH5 · Fictional production

Rejected
HAIEC Assurance Result
Review required
Human Review Decision
Rejected
Monitoring Coverage
Partial — simulated
Approver role (fictional)
Production Planning Manager

The scheduling agent's release path could reach APS/MES without qualified mediation evidence — an unmediated write path is never authorized. Read-only optimization proposals remain a separate permitted workflow.

✓ Generate read-only optimization proposals✓ Annotate proposed sequence changes for planner review✗ Commit or release a production schedule✗ Write to APS/MES dispatch state✗ Bypass the planner release authority

Next: Requested expansion stays closed; advisory work continues under the existing scope.

Torque Quality — Station 217

SYS-217 · Fictional production

Pending human review
HAIEC Assurance Result
Review required
Human Review Decision
Pending human review
Monitoring Coverage
Partial — simulated
Approver role (fictional)
Quality Director

The canonical wrong-target finding shows a recorded effect on WO-217-4803 while WO-217-4802 was the approved target. Authority expansion cannot proceed until an accountable owner reviews the divergence and the required authority evidence exists.

✓ Existing scoped recommendations under the approved reaction plan✗ Autonomous MES work-order write✗ Release of quality holds

Quality station write expansion. Approved for advisory use only — autonomous production update still pending. Target mismatch observed: recorded effect on work order WO-217-4803 while the approved target was WO-217-4802. The consequential request requires an accountable human decision before any MES write expansion.

Next: Accountable reviewer decision required before any consequential change.

Procurement Agent

SYS-PO12 · Fictional production

Pending human review
HAIEC Assurance Result
Review required
Human Review Decision
Pending human review
Monitoring Coverage
Stale — simulated
Approver role (fictional)
Procurement Manager

PO commitment requires appropriate supplier/part/amount evidence and a qualified human authority. Proposals may proceed; commitment waits for buyer-authority evidence.

✓ Draft purchase-order proposals for buyer review✗ Commit a purchase order✗ Change supplier or quantity on a released PO

Next: Accountable reviewer decision required before any consequential change.

Dynamometer Agent

SYS-DYN412 · Controlled pilot (fictional)

Pending human review
HAIEC Assurance Result
Review required
Human Review Decision
Pending human review
Monitoring Coverage
No live connection
Approver role (fictional)
Test Engineering Manager

The agent can technically reach 19 settings while the approved scope covers three, and the physical controller/readback evidence is missing. Out-of-scope writes stay prohibited pending qualified evidence.

✓ Recommend parameter changes within the declared three-parameter envelope✗ Write to non-delegated controller parameters✗ Unmediated setpoint changes

Next: Accountable reviewer decision required before any consequential change.

Warehouse Copilot

SYS-WH15 · Fictional production

Pending human review
HAIEC Assurance Result
Review required
Human Review Decision
Pending human review
Monitoring Coverage
Partial — simulated
Approver role (fictional)
Warehouse Operations Lead

Held-stock release requires a qualified QMS disposition and a bound WMS actor identity; the scenario evidence could not establish which agent executed the held-lot pick request.

✓ Recommend inventory adjustments for warehouse lead review✗ Release or ship quality-held stock✗ Adjust inventory without a bound WMS actor identity

Next: Accountable reviewer decision required before any consequential change.

About this demonstration

Simulated workflow — fictional demonstration data. Not an authenticated human decision, not a HAIEC release authorization. The playback above is an illustrative operations view — no live dispatcher, connector, email or SMS is connected, and no production command is sent or held. Monitoring coverage is derived from scenario records at a fixed reference time, not live telemetry. HAIEC assurance results remain Review required for all nine systems. Authenticated organization decisions use the real workflow below — sign in and remove ?demo=manufacturing to see it.